Basic Info.
Product Description
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.
Mould material | 100~300k, Mould Material(Soft Mould):P20,718,2738...... |
Specific feed/gate locations | |
Surface finish | Commercial polishing (General Polishing) Highly polish (Mirror Polish) Matte Finish (EDM Treatment) |
3D/2D drawings | STP/ STEP, IGS/ IGES, x_t, CAD |
Fast mould design | We can be within 1-3 working days after getting customer's drawings. |
Lead time | 35 - 45 days after getting the mould design confirmation. |
Mould testing | All of the moulds can be well tested before the shipments. Videos testing the moulds are available. |
Minimum order | Small orders can be accepted. |
Production capacity | 45-50 sets/month. |
Port | Shanghai |
Runner | YUDO runner, hot Runner, cold runner ... ... |
Payment terms | L/C T/T Western Union MoneyGram. |
Mould making service | OEM/ODM service is available. |
After-sales service | Life-long gurantee, Comes with free mold parts. |
Safe packing | In strong wooden pallets to avoid any damages during long transportation. |
Plastic parts | Available (Mould can be reserved in our factory and we can offer product production) |
We have been engaged in this field for 15 years, we've served customers from the United States, the United Kingdom, Spain, Australia, Singapore, Russia and other countries. |
Professional Certification |
Quality control and technology improvement |
•ISOIS09001:2000 |
•SGS certificate |
•The complete quality control system. |
Precision durable mold |
•3 CNC: Precision 0.005mm |
•1 Three dimension:1Precision 0.001mm |
•1 wire drive slowly: Precision 0.002mm |
•2 Mirror discharge: Precision 0.005mm |
100% Guaranteed Quality |
•100% tested(Not Just Batch Tested) |
•SOP standard production |
•IQC(tested all in matical )-IPQC(tested first parts and prodcut)-FQC(tested finished parts)-OQC(Shipments) |
•10 professional quality control inspectors |
Competitive price and service |
•Delivery time: 2-3 Weeks after order |
•Provide new design for customers' requirements |
•Provide DFM Report,Moldflow,Mould Design,MPR,QC Report, Injection parameter sheet,Testing video. |
•Free provided sample. |
•10-20% cheaper than other competitors |
•Return the entire mould cost if you order 500,000pcs product. |
•Life-long guarantee period, which is much longer among this field. |