- Overview
- Product Description
- Detailed Photos
- Company Profile
- Certifications
- Sample display
- Company equipment
- Packaging & Shipping
- FAQ
Basic Info.
Product Description
Regarding the idler flanging stamping die, we use a composite die structure to manufacture the die, and the application of this
structure can greatly save equipment resources and improve production efficiency.
About the mold material selection, we are the selection of high-quality mold steel. At the same time, if you have special
requirements, then we will customize the mold material and mold structure according to your requirements.
Product name | Roller bearing seat mould |
Application | Conveyor equipment |
Material | Q235 |
Standard Parts | MISUMI |
Template flatness | +/-0.005mm |
Quantity | 1 set |
Package | According to customer requirements |
1. What information should the customer provide to get our accurate quotation?
Customer should provide relevant technical requirements, drawings, pictures, industrial voltage, planned output, etc.
2. What is the payment period?
Payment terms are 40% deposit, 60% before delivery (T/T model).
3. What is the delivery time?
Delivery time of machines is 30-60 days after receipt of deposit.
4. Do you test all the goods before delivery?
Yes, we have 100% tests before delivery.
5. Where is your factory? How do I get there?
Our factory is located in Hengshui, Hebei Province, China. Warmly welcome domestic and foreign customers to patronize!
6. What material is your mold made of?
The materials are D2, YG15, DC53, SKD11, D2, SKH-9 and SKH-51
7. What is the biggest pressure in your factory?
I plant 25T, 35T, 45T, 60T, 80T, 110T, 160T punch.
8. What about the machinery in your factory?
Our factory has a full set of processing equipment, including large CNC machining center, Sodic EDM machining, imported EDM-HS, radial drilling machine, milling machine, grinding machine, three-dimensional testing, etc.
9. How does your factory conduct quality control?
Quality comes first. The METS place a strong emphasis on quality control from start to finish. All of these are measured periodically by QC using three-dimensional measuring equipment.